Retooling / Assembly cell
Watch the baseline. Then try a different layout.
—Baseline
—Single-cell estimate
CA$0No physical changes
This focused cell reuses the Factory / Twin robot dimensions and inverse kinematics. It is a browser prototype; a production digital twin needs surveyed geometry, calibrated motion, vendor limits and plant data.
The pallet travels to the fixture, waits for four fasteners, then returns on the same supported shuttle rail. Cycle time includes both transfers, tool travel and four bolting dwells. Travel uses a quintic ease; duration = distance × 1.875 ÷ peak speed. Capacity = 3,600 ÷ cycle seconds, with no OEE, rejects, shifts or upstream bottlenecks assumed.
Each straight tool move is sampled at intervals of at most 0.025 m. At each pose, conservative capsules around the upper arm, forearm and tool are checked against the fixed column box. The demo requires a 0.15 m gap. Reach, equipment footprints, plant bounds and the shuttle connection are also checked. This is a sampled planning check, not continuous collision detection or a certified safety clearance. Self-collision, dynamics, joint-speed limits, payload, cables and other plant equipment require further validation.
Moving an asset more than 0.05 m adds four floor anchors. Installation hours = setup + 0.35 × moved metres + 0.10 × anchors + 0.15 × extra service metres. A process-setting change adds one commissioning hour. Service length is a simple rectilinear route from the fixed utility connection; only additional length is charged.
Total = relocation metres × rate + anchors × rate + extra service metres × rate + installation hours × labour rate + installation hours × downtime rate. Bolting time is the production dwell per fastener; floor anchor costs are a separate installation item. Hardware, permits, tax, licensing, validation and disruption beyond the assumed window are excluded.
“Try pillar clash” and “Try a clear layout” are illustrative presets, not an automatic optimization result. Baseline and proposal remain separate. Red means the proposed run is blocked; it does not represent an actual plant alarm.